Skip to content
LaneWarden

LaneWarden Command

The platform that runs the rules and keeps the record

A live map of every node, the rules that pick sign messages, the approvals that control them, the alerts that reach the right people, and the archive that answers questions years later.

Features

Six things Command does all day

Hosted in a U.S. region, used in a browser, built for ten or more people at once: operators, the engineer, the contractor's supervisor and the on-call technician.

Live map and table

Every node on a map refreshed every 60 seconds, with a table view of the same data for people who prefer rows to pins.

  • Current sign messages and speed limits
  • Speed, volume and occupancy by lane
  • Live video on demand

Rules engine

Queue warning, delay, speed management, entry warning and weather rules, with the thresholds set in the system plan.

  • Two bins in, three bins out
  • Crest-aware sign selection
  • Fail-safe on missing data

Message library and approvals

Automated messages come only from the approved library. Anything else needs approval, and every manual message has a one-click return to automation.

  • Approval workflow for the agency's public information staff
  • Manual override by designated staff only
  • Daily check against permanent ITS sign messages

Alerts

Text and email alerts to the right people for traffic events and for device faults, as set in the alert matrix.

  • Delay thresholds and queue length
  • Communications, position and data gaps
  • Power and low battery

WZDx feed

A WZDx 4.2 device feed published every 60 seconds, plus secure intake of third-party data such as the agency's traveler information feed.

  • Every node mapped to its WZDx device type
  • Planned event IDs from the agency
  • Version tracking

Archive and reports

Every reading, message, status change and alarm, kept for at least three years after the project, with the reports the contract requires.

  • CSV and Excel export
  • Weekly and monthly reports
  • Delay compliance and intrusion logs

Message control

The agency stays in charge of what drivers read

Portable signs speak for the agency. Command makes sure every word on them was approved, and that anyone can see why it is there.
  1. 1

    Rules pick from the library

    Automated messages come only from the approved library, filled in with live values such as travel time.

  2. 2

    Anything else needs approval

    A manual message is requested by an operator and approved by the agency's public information officer or the engineer.

  3. 3

    Every change is logged

    Who asked, who approved, why, when it went up and when it came down.

  4. 4

    One click back

    Return to automation restores the rules on that sign. Nothing stays manual by accident.

MK-WB · westbound

Queue warning
Source
Rule: queue warning, heavy
Why this sign
Nearest sign at least ½ mile before the tail
Detection
P-4 reads 11 mph
Release
After three calmer 60-second bins

Example from the demonstration corridor. Simulated data.

Service levels

Targets we design to

Command availability
99.9%
Monthly design target; specifications typically require 99%
Data correction
1 h
Bad or missing data corrected or flagged
Field repairs
24 h
From fault alert to working device
Archive
3 yr
All data, messages and alarms after the project ends

Security

Built to the agency's security policies

A system that can change highway signs has to be hard to misuse. These controls are part of the design; a security audit is planned before deployment.
  • Least-privilege roles

    Role-based accounts; only designated staff can override signs.

  • Strong sign-in

    Single sign-on with multi-factor authentication for privileged users, lockout after failed attempts.

  • Sessions

    20-minute idle timeout and passwords of at least 9 characters.

  • Audit trail

    Every message, override, threshold change and acknowledgment is logged.

  • No open ports in the field

    Nodes connect outbound only, through a VPN with IP allowlisting.

  • Tested and sanitized

    Vulnerability scanning, an incident response plan and NIST SP 800-88 media sanitization.

Next step

Planning a work zone that needs to be smart?

Tell us about the corridor, the schedule and the specification. We will walk you through how the system would be laid out and run.