Pattern
Reports the displayed pattern, for example a flashing arrow or caution mode.
Locate the work zone
A connected kit fitted to the contractor's arrow board. It reports the board's pattern and position, so Command and the WZDx feed show the lane closure without anyone calling it in.
Arrow boards are already on every lane closure. Arrow Link turns them into data: the pattern shown, where the board is and whether it is in transport position.
What it does
Reports the displayed pattern, for example a flashing arrow or caution mode.
Reports where the board is and whether it is folded for transport.
See the arrow board in the WZDx feed, with the same rules the system runs.
Open in the demoSpecifications
| Item | Value |
|---|---|
| Fits | The contractor's existing arrow boards |
| Reports | Pattern, position, transport position |
| Communications | Cellular |
arrow-board
Pattern and transport position.
The kit reports through its maker’s cloud service, which Command reads and republishes in the WZDx feed.
Works with
Locate the work zone
Location beacon for the start and end of the work zone
A GPS beacon on a drum or barricade at the start and end of the work zone, so the published work zone matches the road, and staff get an alert if the device is moved or knocked over.
Inform drivers
Portable changeable message sign that measures the traffic it warns
A full-matrix portable message sign with a Doppler radar facing oncoming traffic. It posts queue, delay and hazard messages from an approved library, and falls back to a safe message on its own if its data stops.
Next step
Tell us about the corridor, the schedule and the specification. We will walk you through how the system would be laid out and run.